Please be informed that this website is scheduled to be decommissioned on December the 1st 2024.
Make sure to visit our new publications page https://www.tennet.eu/markets/transparency-netherlands.
A token is required to be able to download the data automatically.
A token set for test and production can be requested via https://www.tennet.eu/registration-api-token.
Deze website wordt op 1 december 2024 buiten werking gesteld.
Bezoek onze nieuwe publicatiepagina https://www.tennet.eu/nl/transparantie-nederland.
Om de gegevens automatisch te kunnen downloaden is een token nodig.
Een tokenset voor test en productie kunt u aanvragen via https://www.tennet.eu/registration-api-token.
Publication on our website of the installed capacity and fuel type constitutes compliance
with Article 2.5.1. of the System Code.
Select a quarter below to see an overview of the total reported installed capacity
on each day of that quarter. A detailed overview of the installed capacity
and the fuel type of each production unit can be downloaded via the “export data”
functionality above.