Dear sir / madam,
For the timeframe(s) mentioned below TenneT requests market parties for extra reserve-capacity with activation time greater than or equal to 5 PTE (block-bids; pay as bid) to solve expected congestion in the area mentioned below, Reserve capacity in Both upward and downward direction area required; please respect the defined power categories.
If necessary after gate closure, you can ask TenneT to supply a request number (phone number is mentioned above).
Date: 26-jul-2019
Period 1
PTE: 89 t/m 92
Time: 22:00 - 23:00 h
Area: Eemshaven
Desired direction bid: downward / afregelend
Amount extra reserve-capacity: 578 MW
Period 2
PTE: 93 t/m 96
Time: 23:00 - 24:00 h
Area: Eemshaven
Desired direction bid: downward / afregelend
Amount extra reserve-capacity: 160 MW
Period 3
PTE: nvt
Time: 00:00 - 00:00 h
Area: Not applicable / Niet van toepassing
Desired direction bid: not applicable / niet van toepassing
Amount extra reserve-capacity: 0 MW
Period 4
PTE : nvt
Time: 00:00 - 00:00 h
Area: Not applicable / Niet van toepassing
Desired direction bid: not applicable / niet van toepassing
Amount extra reserve-capacity: 0 MW
Regards,
TenneT TSO B.V.