loading ...

Spatial integration of high-voltage lines and substations


0511071 Spatial Integration 27-10-2011 TenneT devotes careful attention to integrating newly built high-voltage lines and substations into the landscape. In the planning preparations for grid expansions, we make every effort to achieve the best possible balance between security of supply and integration into the surroundings.

Downloads

Spatial integration (pdf 447,98 Kb)



TenneT Holding B.V.