Cable installation
The cable installation vessel CS Skagerrak uses a robot to install the NorNed cable. This ROV (remotely operated vehicle) comes equipped with an underwater camera and grabs. It can help find previously installed sections of the cable, which is useful when two sections of the cable have to be joined. Furthermore, the robot is a practical tool for finding or removing obstacles or for crossing cables with other cables installed on the seabed. Would you like to see what the seabed between Eemshaven and Feda looks like? Then have a look at this underwater footage…




