Determination cross border capacity NetherlandsThis document explains how TenneT in cooperation with the TSOs in the CWE region (Central Western Europe: Benelux, France and Germany) the cross border capacity available to the market is been determined, based on the currently applied ATC methodology.
Investigation of capacity during wintertime
Section 5.7.1.5 of the Netherlands Grid Code stipulates that the transmission capacity
should be separately calculated for the winter.