loading ...
Operational management
 TenneT-logo
home  |  sitemap  |  faq  |  newsletter  |  contact

Report on extra reserve capacity in case of extension of cooling water limits


From the moment when the total available regulating and reserve capacity with a dispatch time of up to 8 hours drops to below 1400 MW, producers will report to TenneT before 2 p.m. how much extra reserve capacity with a dispatch time of 15 minutes or less they will be able to offer if the cooling water limits are extended by 1 or 2 degrees centigrade. 

To report this extra reserve capacity, please use the form that can be downloaded below.

Downloads

Report extra capacity (xls 15,00 Kb)



TenneT TSO B.V